Welcome,
Logout
Premium Windows, Doors & Aluminum Solutions
Customer Information
Customer Name
Project Name
Quotation Date
Add Product Details
Product Category
Select Category
Windows
Doors
Grills
Aluminum Section
Nets
Glass Work
Fix Partition Work
Domal series sliding window
z-bath fix window
domal window with mosquito-net
z-series openable window with safety grill
Cradinal
royal venetana with leg sliding series window
Other
Product Type / Model / Desc.
Location
Select Location
Living Room
Bedroom
Kitchen
Bathroom
Balcony
Dining Room
Study Room
Guest Room
Main Entrance
Back Door
Terrace
Staircase
Other
Height (inches)
Width (inches)
Size (sq.ft.)
Quantity
Rate (₹ per sq.ft.)
Total Amount
Specifications
Details
Sash Details
Lock Specifications
Lock Type
Select Lock Type
Multi-point Lock
Single Point Lock
Mortise Lock
Cylinder Lock
Sliding Lock
Deadbolt Lock
Padlock
No Lock
Other
Description
Glass Specifications
Glass Type
Select Glass Type
Clear Glass
Tempered Glass
Laminated Glass
Frosted Glass
Tinted Glass
Low-E Glass
Double Glazed
Triple Glazed
Reflective Glass
Patterned Glass
Acoustic Glass
Other
Thickness (mm)
Description
Custom Fields
Add Custom Field
Apply GST (18%)
Add Item to Quotation
Cancel Edit
Download PDF
All Type Of Glass and Aluminium Work
GST Number: 24AQQPC8922K1ZI
Ph:
(+91) 8347029355 |
Email:
aryanwindowworld@gmail.com |
Address:
Nr. Vora Society, Yogi Park, Plot No-40, Opp. J B Godown, Rajkot, Gujarat
Date:
Quotation No:
Customer Information
Customer Name:
-
Project Name:
-
Items
SR NO.
PRODUCT SPECIFICATION
LOCATION
AREA
QTY
UNIT RATE
TOTAL
Actions
Total Items
0
Sq.ft (Approx)
0
Sub Total
₹0
GST (18%)
₹0
Grand Total
₹0
Terms & Conditions
The above quotation is valid for 30 days from the date of issue.
Installation charges are included in the quoted price unless otherwise specified.
The Advance Payment of 50% should paid after the conformation of order.
Measurement will be taken after confirmation (if needed) of order and final billing will be done based on actual measurement.
Work Completion Estimate time: 40-45 working days from the date of measurement and advance payment.
Transportation and unloading charges are included within city limits.
Site should be ready with necessary civil work completed before installation.
Client to provide electricity and water facility at the installation site.
Any additional accessories or modifications requested during installation will be charged separately.
Disputes, if any, are subject to Rajkot jurisdiction only.